Friday, January 23, 2009

More electrical work

We didn't get to spend a lot of time out at the house today but I did get some things accomplished. I worked on installing the second circuit to the kitchen. The second circuit will run the fridge, dish washer, garbage disposal, and attic light. There will also be a third circuit run, it will control the chandelier, the recessed lighting, and the under counter lights.

I ran the circuits down from the attic space above the kitchen. Why I didn't think to do this for the first circuit I don't know. It would have saved me a lot of crawling around in the dirt under the house...

I'm running the wiring through the holes that the knob & tube wiring ran through.




The last picture above is the wiring for the attic light.

I found an old Bulldog friction tape box in the attic, it was used to tape up the knob & tube wiring.



We hope to get back out there some time this weekend to finish up the wiring.

1 comment:

Christopher Busta-Peck said...

Yay for new wiring!

I love the aesthetic of Bull Dog Electrical's products. Would I pay more for something like that today? No. But given the choice between two products of equal quality and price, would I chose the one with the interesting picture on it? Probably.