This is a big project that I have been needing to get done for a while. Especially now that it's getting cold out. The cold air comes up through all the holes in the floor so this project had to get done.
As I've mentioned before the side hall was converted into a bathroom in 1928, last year I tore the wall down and turned it back into a side hall.
The Red Oak flooring on the first floor was installed over the original floor sometime in the 40's so the side hall didnt get done since it was a bathroom at the time.
I started by tearing up the plywood.
and found linoleum underneath.
I pulled that up and the original flooring under that was pretty rotted, which I had expected, so I pulled that up.
Of course most of the floor joists were rotted and hacked up and patched so I tore out the rotted ones and installed new ones. I used 2x8s ripped to a full 6" to match.
I took this opportunity to do a few other things under the house that needed to get done. I dug out a large area under the ducting so I could have access to underneath the bathroom, I ran some electrical from the bathroom, and I removed the 2 return vents that the moron HVAC guys had put in. They will be relocated to the dining room.
After that I put the sub-floor in with old 1x boards that I had.
Then I pulled up the old red oak flooring on the other side of the hall.
Then laid down felt paper.
Then I began the flooring. For the door sills that go to the bathroom and the sunroom I used 5" wide oak flooring. I kept the tongue on the sill so I could lock the flooring into it since it has grooves on the sides.
Here are some shots of the progress.
I still have a little strip along the wall to finish up. Not sure yet when I will be able to sand and finish it.
Monday, October 18, 2010
Tuesday, October 12, 2010
Dining Room Door
In our dining room there are some shelves in what used to be a window, that was originally a door. I've been using it to store tools, nails, and other miscellaneous junk.
I thought about returning it to a window but to do that I would want to make it the same size as the rest of the windows in the house. This would require tearing out a large portion of the wall and a lot of re-framing.
So I decided to go back to a door instead. This would require a lot less work and it would return it to the way it was originally, I'm a big fan of returning things back to their original state whenever possible.
I started by removing all the tools and junk, then I removed the shelves and casing.
Next I removed the window framing.
Then I installed a sill, built the door casing, cut the door to the proper size, mortised the door and the jam for the hinges, and hung the door.
I still have a lot left to do, I need to install the inner door casing, plinth blocks, and rosettes, trim, install glass in the missing panes, install a door knob and lock, and caulk, primer and paint everything.
I thought about returning it to a window but to do that I would want to make it the same size as the rest of the windows in the house. This would require tearing out a large portion of the wall and a lot of re-framing.
So I decided to go back to a door instead. This would require a lot less work and it would return it to the way it was originally, I'm a big fan of returning things back to their original state whenever possible.
I started by removing all the tools and junk, then I removed the shelves and casing.
Next I removed the window framing.
Then I installed a sill, built the door casing, cut the door to the proper size, mortised the door and the jam for the hinges, and hung the door.
I still have a lot left to do, I need to install the inner door casing, plinth blocks, and rosettes, trim, install glass in the missing panes, install a door knob and lock, and caulk, primer and paint everything.
Monday, October 11, 2010
Lattice and gates for the deck
This weekend I put up the lattice under the deck and built a pair of gates.
In the above picture the lattice is just resting in place. It, along with the deck will eventually be stained.
Our garden is coming along nicely. The Mustards and Lettuce are just about ready to pick.
In the above picture the lattice is just resting in place. It, along with the deck will eventually be stained.
Our garden is coming along nicely. The Mustards and Lettuce are just about ready to pick.
Wednesday, October 6, 2010
Workshop Electrical
I got a lot done on the shop over the weekend but most of it was the boring, non-picture worthy kind.
I dug a trench from the house to the shop and ran electrical in conduit.
Then I wired up the shop with lighting and outlets.
I spent yesterday and the day before arranging the layout and building workbenches.I also picked up a few new tools that I will be needing. I picked up a Wood Lathe, a 6" Jointer, and I traded my smaller table saw for a larger one.
I will have pictures of that in my next post.
I dug a trench from the house to the shop and ran electrical in conduit.
Then I wired up the shop with lighting and outlets.
I spent yesterday and the day before arranging the layout and building workbenches.I also picked up a few new tools that I will be needing. I picked up a Wood Lathe, a 6" Jointer, and I traded my smaller table saw for a larger one.
I will have pictures of that in my next post.
Wednesday, September 29, 2010
Workshop Doors
The only thing I had time to do yesterday was frame out the doorway and throw up some doors.
The white door is pretty hacked up but I will be repairing it later on so it will match the other one, I just needed to get a door up for now.
Next it's on to the electrical...
The white door is pretty hacked up but I will be repairing it later on so it will match the other one, I just needed to get a door up for now.
Next it's on to the electrical...
Tuesday, September 28, 2010
Workshop Windows
I managed to get both of the windows installed and trimed out yesterday.
I still need to install the head casing on the outside of the second window.
Next it's on to the doors.
I still need to install the head casing on the outside of the second window.
Next it's on to the doors.
Monday, September 27, 2010
Workshop Tin
Yesterday I got a bunch of tin from a friend in town. Rain was on the way so I had to hurry to get the roof on in time. I just barely finished the roof before it started raining. I did the walls in the rain.
The roof is new tin, I decided to use old tin for the walls to better match the existing structure. I had just enough to do the front and side walls but I had to use new tin for the back wall. Once the entire shop is complete I will paint everything so it will match better.
Here is a shot of the new section from the inside. The center braces are temporary, I still need to install some support bracing to the rafters.
Next I need to frame out and install the windows and doors.
The roof is new tin, I decided to use old tin for the walls to better match the existing structure. I had just enough to do the front and side walls but I had to use new tin for the back wall. Once the entire shop is complete I will paint everything so it will match better.
Here is a shot of the new section from the inside. The center braces are temporary, I still need to install some support bracing to the rafters.
Next I need to frame out and install the windows and doors.
Thursday, September 23, 2010
Hen nest boxes
I haven't had time to get tin for my shop so no real progress there. In the meantime I built some nest boxes for my hens since they havent had anywhere to lay.
These are Black Copper Marans eggs. They are the absolute best tasting eggs there are.
As you can see they were thankful.
These are Black Copper Marans eggs. They are the absolute best tasting eggs there are.
As you can see they were thankful.
Monday, September 20, 2010
Workshop progress & house paint
Work has been progressing on the workshop. I've had a lot of other things going on though so it's not been at the pace I'd hoped for.
After my last post I went and got the rest of the wood that I needed and installed the floor joists...
and the flooring. The flooring is yellow pine 2x12's.
I removed the original back wall of the shed to be able to tie in the new section.
Next I started the framing.
I prefer to build my walls in place instead of on the ground then raising them up. The wide opening in the picture is for a set of double doors, each is 2' wide.
The opening on the back wall is for a window. I'm also installing one on the side wall. The windows are 3 over 1, they came from an old farmhouse in Calhoun, Ga that was being torn down.
After the walls were framed up I installed the ridge beam...
and then the rafters and purlins.
Now I just need to get some tin so I can put the roof and walls up.
Meanwhile, while I was doing all of this I had a crew scraping and primering the house.
After my last post I went and got the rest of the wood that I needed and installed the floor joists...
and the flooring. The flooring is yellow pine 2x12's.
I removed the original back wall of the shed to be able to tie in the new section.
Next I started the framing.
I prefer to build my walls in place instead of on the ground then raising them up. The wide opening in the picture is for a set of double doors, each is 2' wide.
The opening on the back wall is for a window. I'm also installing one on the side wall. The windows are 3 over 1, they came from an old farmhouse in Calhoun, Ga that was being torn down.
After the walls were framed up I installed the ridge beam...
and then the rafters and purlins.
Now I just need to get some tin so I can put the roof and walls up.
Meanwhile, while I was doing all of this I had a crew scraping and primering the house.