Here are a few pictures of the work done over the last few days.
Here is the room after the second sanding of the mud. The window in this room is in very bad shape. It wasn't built properly in the first place and now it's falling apart. I an going to completely rebuild the window in the spring or early summer but for now I'm just cleaning it up and putting some new casing on it.
Here's the new casing on the window.
Next I painted the room, we found another can of oops paint that was the perfect color and even better it's semi-gloss. After painting the room I began installing the plumbing for the fixtures.
Installing the sink faucet was a huge pain in the ass. First the center hole on the bowl was not big enough for the faucet to fit through. I had to grind it out with my dremel, the bits I had were very cheap and china is very hard so I went through about a bit a minute but I was finally able to enlarge the hole enough for it to fit.
So then I finally get the entire faucet together and realize that I need to take the handles back out to be able to bolt the bowl to the wall. Now with the bowl up against the wall there is almost no room to work so putting the handles back in took a while. The next issue is that there is so little room under the sink that it was very hard to install the braided hoses without them kinking. There are two that go from the faucet to the handles then two that go from the handles to the supply valves.
I finally got it all together, here is a pic of it.
I think it looks pretty good, by the way we got both this faucet and the shower kit on closeout for about $160 total.
Here are the rest of the bathroom pics.
Sink
Toilet with antique toilet seat
The completed window.. for now