Tuesday, September 28, 2010

Workshop Windows

I managed to get both of the windows installed and trimed out yesterday.








I still need to install the head casing on the outside of the second window.

Next it's on to the doors.

Monday, September 27, 2010

Workshop Tin

Yesterday I got a bunch of tin from a friend in town. Rain was on the way so I had to hurry to get the roof on in time. I just barely finished the roof before it started raining. I did the walls in the rain.




The roof is new tin, I decided to use old tin for the walls to better match the existing structure. I had just enough to do the front and side walls but I had to use new tin for the back wall. Once the entire shop is complete I will paint everything so it will match better.

Here is a shot of the new section from the inside. The center braces are temporary, I still need to install some support bracing to the rafters.


Next I need to frame out and install the windows and doors.


Thursday, September 23, 2010

Hen nest boxes

I haven't had time to get tin for my shop so no real progress there. In the meantime I built some nest boxes for my hens since they havent had anywhere to lay.


These are Black Copper Marans eggs. They are the absolute best tasting eggs there are.



As you can see they were thankful.

Monday, September 20, 2010

Workshop progress & house paint

Work has been progressing on the workshop. I've had a lot of other things going on though so it's not been at the pace I'd hoped for.

After my last post I went and got the rest of the wood that I needed and installed the floor joists...


and the flooring. The flooring is yellow pine 2x12's.



I removed the original back wall of the shed to be able to tie in the new section.





Next I started the framing.



I prefer to build my walls in place instead of on the ground then raising them up. The wide opening in the picture is for a set of double doors, each is 2' wide.



The opening on the back wall is for a window. I'm also installing one on the side wall. The windows are 3 over 1, they came from an old farmhouse in Calhoun, Ga that was being torn down.

After the walls were framed up I installed the ridge beam...


and then the rafters and purlins.


Now I just need to get some tin so I can put the roof and walls up.


Meanwhile, while I was doing all of this I had a crew scraping and primering the house.



Monday, September 13, 2010

Chickens! ...and a workshop

I've been working on two big projects over the last 5 days or so. The first is a chicken coop. We've decided that we want to try raising chickens, mostly for the eggs.

We decided to put the coop next to the barn.


The overgrown area to the left of the barn is the spot.

I completely cleared out the area and then built the coop. I dont have any during pictues but it's basically built out of pressure-treated 2x4's for the framing, chicken wire for the sides, and tin for half of the roof and plastic fencing for the other half.


The area beyond the coop and to the left of the barn will be closed in for another coop soon.

The chickens we are concentrating on are Black Copper Marans, they have very dark, reddish brown eggs that are supposed to be highly prized for their excellent taste. Here is our Marens rooster.




We also have some Dominickers, Cochins, and a few Silkies.

The other project I began working on is a workshop. I really need a place to work and to put all my tools.

The shed behind the kitchen is nice but at 11x11 it's too small.



What I decided to do it tear down the lean-to on the back side of it and add on to the main structure. I will be adding on another 11'. So it will be 22x11. The 11 is a bit smaller that I'd like but I think it will be ok.



The lean-to was so rotted that it only took about 15 minutes to completely tear down by hand. It took longer to haul away the debris.


I pulled up the old blocks to reuse for the new foundation. I had to use a few new blocks.



Next, I pulled the bottom piece of tin off the wall to install the ledger board.




Then I setup the rest of the framing for the joists.


That was as far as I got last night. I was three joists short anyways. I will get them on the way home from work today and also the flooring, I will be using 2x12's just like in the original portion of the shed.

Tuesday, August 31, 2010

garden

We've been working on a vegetable garden in our back yard. We're going to plant late season crops like broccoli, Collard and Mustard Greens, lettuce, and a few other things. We bought most of them as plants, the rest I started from seed a few weeks back.

I tilled up a small area in the back yard next to the barn that's about 35'x20'.


Then I put up a chicken wire fence.


This is our two Danes checking out my work.


Once I rake it out and hoe the rows I will plant everything.

Friday, August 27, 2010

Work continues on the columns

I am slowly getting the columns done. So far I have 4 of the 8 1/2 columns that I took down re-installed.

I'm making one change to the columns as I put them back up. The cap where the top and bottom parts of the colum meet is a weak spot. The cap is nailed to the bottom part of the column then the top part is toe-nailed to the cap.


I know it sat that way for over 100 years without a problem but I feel better adding a little structural staility to this area.

What I'm doing is taking a small 4x4 piece and screwing it to the base with 3" deck screws. I then screw a 3/4" piece of flooring to the 4x4. This makes 4 1/4", the size of the opening in the top part of the column.


I then take the top part of the column and slide it over the 4x4 and secure it into place with more 3" deck screws. This also has the added benefit of repairing the caps, most of which are split in half as you can see from the picture above.




I got a little bit ahead of myself and started installing them before primering. Hopefully I can finish all the columns by this weekend. That may be a bit of a challenge though, the double column by the steps has rot at the base, and the capital is rotted on the single column across from it.

Monday, August 23, 2010

Porch Columns

I decided to get back to work on the front porch columns. They have been sitting outside in the elements since I took them down way back in March.

I didn't get many pictures of my progress. Here is a picture of one of the columns during scraping.


This is the top half of the column. I am completely removing all the paint from the columns so it's a very slow and tedious process. I completely stripped, primered and installed one column and stripped half of another column before it got dark.

Here is a pic of the column installed, it's not a great shot since it was dark before I remembered to take the picture:

Thursday, August 19, 2010

Side Hall Wainscoting

Last night I finished the side hall wainscoting. In an earlier post I had shown how someone used black tar to stick paneling to the wall. This tar was all over the wainscoting. Here is a picture from last week, you can see the tar covering the wainscoting:



You can also see the missing boards to the right. These were removed to run the plumbing, electrical, cable, and the vacuum line.

The 3" drain pipe sticks out slightly from the wall so I couldn't just slap a board over it.


I had to remove some material from the back of the piece of beadboard for it to sit flush. I did this with a table saw.


Here are the boards test fitted into place:


The last board will need to be ripped to fit. I am not going to install the 3 boards that cover the vacuum line yet because I still need to tie it in under the house so I want to leave it open for easy access.

With all that done I got to work removing the tar. I started by using a heat gun but the tar just got very gooey and was making a worse mess. The best method I found for removing it was to use a very sharp scraper. I had to re-sharpen the scraper every 5 minutes or so but it worked pretty good.


Notice the outline on the wall? Looks like there was a large radiator here before it was converted to a bathroom.

Once all the tar was removed I sanded the boards smooth and then primered and painted them.




Next I need to get the chair rail and picture rail made. I also need to buy the oak T&G flooring, I am going to pull up the existing flooring all the way up to the edge of the main hall and then lay the new flooring down.. Before I do that though I need to fix the sub-floor just to the left of the bathroom door. The toilet sat here so it's in pretty bad shape.

Thursday, August 12, 2010

Hall Corner

I've finished the outside corner where the two halls join.

I sanded and put the final coat of mud up on Tuesday.


Then last night I did the final sanding and  painted it.



Next up I need to finish the side hall. As you can see from the pictures above I have a lot of work to do on the beadboard. The side hall was turned into a bathroom in 1922, at some point after that the beadboard was covered up with paneling that was glued to it with some kind of black tar. It's this tar that I need to remove before I can paint it.

I also need to have some picture rail and chair rail replicated for this area as the original is long gone, it was most likely removed when the paneling was put up. The gap between the sheetrock and the beadboard is for the chair rail. I also need to find some crown for the ceiling.

Tuesday, August 10, 2010

Main Hall

I worked on the hallways over the weekend. I finished the main hall and almost finished the side hall.

After the final coat and sanding of mud I primered everything.

The corner between the two hallways is coming along. 


It needs a sanding, one more coat of mud then a final sanding.

I went ahead and painted the main hall to get it done and out of the way.



I'm hoping to finish up the side hall in the next day or two.