I've spent the last few weeks working on the house. The side hall was the first project I worked on.
Back in October of last year I laid the new oak flooring in the side hall but I never finished the last row.
It only took about an hour to install the final row of flooring, but last year I spent two sixteen hour days on it and by the time I got to the last row, which I had to rip down to the right size, I was just too tired to finish.
With the floor finally finished I turned to the chair rail. I was originally going to have some made for me but once I looked closely at the profile I realized that I had a router bit that could do it in two passes.
It's an almost perfect match to the original. Next I finished the sheetrock above the chair rail.
The trim that makes the bottom part of the chair rail will have to be made, I cant do it and there is nothing even close at the store.
Here are a few pics of the side hall now.
Left to do still is the trim for the bottom of the chair rail, picture rail, and crown. Oh, and replicate a leg for the Empire dresser...
Showing posts with label side hall. Show all posts
Showing posts with label side hall. Show all posts
Saturday, December 31, 2011
Monday, October 18, 2010
Side Hall Floor
This is a big project that I have been needing to get done for a while. Especially now that it's getting cold out. The cold air comes up through all the holes in the floor so this project had to get done.
As I've mentioned before the side hall was converted into a bathroom in 1928, last year I tore the wall down and turned it back into a side hall.
The Red Oak flooring on the first floor was installed over the original floor sometime in the 40's so the side hall didnt get done since it was a bathroom at the time.
I started by tearing up the plywood.
and found linoleum underneath.
I pulled that up and the original flooring under that was pretty rotted, which I had expected, so I pulled that up.
Of course most of the floor joists were rotted and hacked up and patched so I tore out the rotted ones and installed new ones. I used 2x8s ripped to a full 6" to match.
I took this opportunity to do a few other things under the house that needed to get done. I dug out a large area under the ducting so I could have access to underneath the bathroom, I ran some electrical from the bathroom, and I removed the 2 return vents that the moron HVAC guys had put in. They will be relocated to the dining room.
After that I put the sub-floor in with old 1x boards that I had.
Then I pulled up the old red oak flooring on the other side of the hall.
Then laid down felt paper.
Then I began the flooring. For the door sills that go to the bathroom and the sunroom I used 5" wide oak flooring. I kept the tongue on the sill so I could lock the flooring into it since it has grooves on the sides.
Here are some shots of the progress.
I still have a little strip along the wall to finish up. Not sure yet when I will be able to sand and finish it.
As I've mentioned before the side hall was converted into a bathroom in 1928, last year I tore the wall down and turned it back into a side hall.
The Red Oak flooring on the first floor was installed over the original floor sometime in the 40's so the side hall didnt get done since it was a bathroom at the time.
I started by tearing up the plywood.
and found linoleum underneath.
I pulled that up and the original flooring under that was pretty rotted, which I had expected, so I pulled that up.
Of course most of the floor joists were rotted and hacked up and patched so I tore out the rotted ones and installed new ones. I used 2x8s ripped to a full 6" to match.
I took this opportunity to do a few other things under the house that needed to get done. I dug out a large area under the ducting so I could have access to underneath the bathroom, I ran some electrical from the bathroom, and I removed the 2 return vents that the moron HVAC guys had put in. They will be relocated to the dining room.
After that I put the sub-floor in with old 1x boards that I had.
Then I pulled up the old red oak flooring on the other side of the hall.
Then laid down felt paper.
Then I began the flooring. For the door sills that go to the bathroom and the sunroom I used 5" wide oak flooring. I kept the tongue on the sill so I could lock the flooring into it since it has grooves on the sides.
Here are some shots of the progress.
I still have a little strip along the wall to finish up. Not sure yet when I will be able to sand and finish it.
Labels:
Demo,
Electrical,
flooring,
house history,
side hall
Thursday, August 19, 2010
Side Hall Wainscoting
Last night I finished the side hall wainscoting. In an earlier post I had shown how someone used black tar to stick paneling to the wall. This tar was all over the wainscoting. Here is a picture from last week, you can see the tar covering the wainscoting:
You can also see the missing boards to the right. These were removed to run the plumbing, electrical, cable, and the vacuum line.
The 3" drain pipe sticks out slightly from the wall so I couldn't just slap a board over it.
I had to remove some material from the back of the piece of beadboard for it to sit flush. I did this with a table saw.
Here are the boards test fitted into place:
The last board will need to be ripped to fit. I am not going to install the 3 boards that cover the vacuum line yet because I still need to tie it in under the house so I want to leave it open for easy access.
With all that done I got to work removing the tar. I started by using a heat gun but the tar just got very gooey and was making a worse mess. The best method I found for removing it was to use a very sharp scraper. I had to re-sharpen the scraper every 5 minutes or so but it worked pretty good.
Notice the outline on the wall? Looks like there was a large radiator here before it was converted to a bathroom.
Once all the tar was removed I sanded the boards smooth and then primered and painted them.
Next I need to get the chair rail and picture rail made. I also need to buy the oak T&G flooring, I am going to pull up the existing flooring all the way up to the edge of the main hall and then lay the new flooring down.. Before I do that though I need to fix the sub-floor just to the left of the bathroom door. The toilet sat here so it's in pretty bad shape.
You can also see the missing boards to the right. These were removed to run the plumbing, electrical, cable, and the vacuum line.
The 3" drain pipe sticks out slightly from the wall so I couldn't just slap a board over it.
I had to remove some material from the back of the piece of beadboard for it to sit flush. I did this with a table saw.
Here are the boards test fitted into place:
The last board will need to be ripped to fit. I am not going to install the 3 boards that cover the vacuum line yet because I still need to tie it in under the house so I want to leave it open for easy access.
With all that done I got to work removing the tar. I started by using a heat gun but the tar just got very gooey and was making a worse mess. The best method I found for removing it was to use a very sharp scraper. I had to re-sharpen the scraper every 5 minutes or so but it worked pretty good.
Notice the outline on the wall? Looks like there was a large radiator here before it was converted to a bathroom.
Once all the tar was removed I sanded the boards smooth and then primered and painted them.
Next I need to get the chair rail and picture rail made. I also need to buy the oak T&G flooring, I am going to pull up the existing flooring all the way up to the edge of the main hall and then lay the new flooring down.. Before I do that though I need to fix the sub-floor just to the left of the bathroom door. The toilet sat here so it's in pretty bad shape.
Thursday, August 12, 2010
Hall Corner
I've finished the outside corner where the two halls join.
I sanded and put the final coat of mud up on Tuesday.
Then last night I did the final sanding and painted it.
Next up I need to finish the side hall. As you can see from the pictures above I have a lot of work to do on the beadboard. The side hall was turned into a bathroom in 1922, at some point after that the beadboard was covered up with paneling that was glued to it with some kind of black tar. It's this tar that I need to remove before I can paint it.
I also need to have some picture rail and chair rail replicated for this area as the original is long gone, it was most likely removed when the paneling was put up. The gap between the sheetrock and the beadboard is for the chair rail. I also need to find some crown for the ceiling.
I sanded and put the final coat of mud up on Tuesday.
Then last night I did the final sanding and painted it.
Next up I need to finish the side hall. As you can see from the pictures above I have a lot of work to do on the beadboard. The side hall was turned into a bathroom in 1922, at some point after that the beadboard was covered up with paneling that was glued to it with some kind of black tar. It's this tar that I need to remove before I can paint it.
I also need to have some picture rail and chair rail replicated for this area as the original is long gone, it was most likely removed when the paneling was put up. The gap between the sheetrock and the beadboard is for the chair rail. I also need to find some crown for the ceiling.
Labels:
main hall,
Paint,
Plaster/Drywall,
side hall
Tuesday, August 10, 2010
Main Hall
I worked on the hallways over the weekend. I finished the main hall and almost finished the side hall.
After the final coat and sanding of mud I primered everything.
The corner between the two hallways is coming along.
It needs a sanding, one more coat of mud then a final sanding.
I went ahead and painted the main hall to get it done and out of the way.
I'm hoping to finish up the side hall in the next day or two.
After the final coat and sanding of mud I primered everything.
The corner between the two hallways is coming along.
It needs a sanding, one more coat of mud then a final sanding.
I went ahead and painted the main hall to get it done and out of the way.
I'm hoping to finish up the side hall in the next day or two.
Labels:
main hall,
Paint,
Plaster/Drywall,
side hall
Monday, August 2, 2010
Side Hall
This weekend I worked on the side hall. Here is a pic of how the hall looked last year:
I knew I wasn't going to finish it on my own so I hired on someone to help me. We took down all the plaster and lathe, then put up a few 2x4 studs in the corners, then put up sheetrock, then tape and mud.
Here it is after this weekend:
The small gap between the sheetrock and the wainscotting is for the chair rail that I need to have cut. I'll sand today and put up one more coat of mud. Then I can do the final sanding, primer, then paint.
I knew I wasn't going to finish it on my own so I hired on someone to help me. We took down all the plaster and lathe, then put up a few 2x4 studs in the corners, then put up sheetrock, then tape and mud.
Here it is after this weekend:
The small gap between the sheetrock and the wainscotting is for the chair rail that I need to have cut. I'll sand today and put up one more coat of mud. Then I can do the final sanding, primer, then paint.
Labels:
Demo,
main hall,
Plaster/Drywall,
side hall
Monday, July 26, 2010
Foyer and Side Hall
Wow, almost 2 months without a post! Things have been hectic around here lately. I have done some work on the house though. Two of the projects I have been working on are the Foyer and the Side Hall.
I've been dying to get the foyer done because it's the first thing everyone see's when entering the house. Here is a picture of how it looked before.
What you can not really see in this picture is the condition of the paint. The white trim is scratched, chipped, and stained and the red is just way too dark for this room.
I spent most of the last two days repainting all of the trim and the walls. Here are a few pictures of what it looks like now.
In the third picture you may have noticed that the front door is not repainted. I am holding off on doing that for now because I am debating on stripping and shellacking it.
You cant see it in the pictures but I removed all the carpeting from the stairs, they were carpeted above the first landing with a nasty old green carpet. The treads are in great shape except for a few paint stains. That shouldn't be too hard to remove.
The other project I have been working on is the side hall.
I ran a 2" PVC vacuum line in the wall for the whole-house vacuum I intend to install in the future. This runs up into the laundry room in the attic.
I also ran some string in the wall for anything I may need to run in the future. One thing I need to run is an Ethernet cable for the video surveillance system I will be installing in the near future.
With that done I started putting up the sheetrock.
The side hall is in the back part of the house where the ceilings are 11', the main hall is 10'. The plumbing from the upstairs bathroom runs down this wall but it comes out from the bathroom floor into the side hall up near the ceiling. I had intended on boxing this in but was not looking forward to it.
Instead we decided to just paint the PVC pipe black to make it look like old cast iron pipe and leave it exposed.
I still need to put up sheetrock behind it but I think it will look fine.
I've been dying to get the foyer done because it's the first thing everyone see's when entering the house. Here is a picture of how it looked before.
What you can not really see in this picture is the condition of the paint. The white trim is scratched, chipped, and stained and the red is just way too dark for this room.
I spent most of the last two days repainting all of the trim and the walls. Here are a few pictures of what it looks like now.
In the third picture you may have noticed that the front door is not repainted. I am holding off on doing that for now because I am debating on stripping and shellacking it.
You cant see it in the pictures but I removed all the carpeting from the stairs, they were carpeted above the first landing with a nasty old green carpet. The treads are in great shape except for a few paint stains. That shouldn't be too hard to remove.
The other project I have been working on is the side hall.
I ran a 2" PVC vacuum line in the wall for the whole-house vacuum I intend to install in the future. This runs up into the laundry room in the attic.
I also ran some string in the wall for anything I may need to run in the future. One thing I need to run is an Ethernet cable for the video surveillance system I will be installing in the near future.
With that done I started putting up the sheetrock.
The side hall is in the back part of the house where the ceilings are 11', the main hall is 10'. The plumbing from the upstairs bathroom runs down this wall but it comes out from the bathroom floor into the side hall up near the ceiling. I had intended on boxing this in but was not looking forward to it.
Instead we decided to just paint the PVC pipe black to make it look like old cast iron pipe and leave it exposed.
I still need to put up sheetrock behind it but I think it will look fine.